Managing supply chain risks and delays in construction project
Department of E-Commerce, Luoyang Normal University, Luoyang, China; Department of Logistics and Supply Chain Management, National Research University Higher School of Economics, St Petersburg, Russia.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Development, IT and Land Management, Industrial economics. University of Gävle, Center for Logistics and Innovative Production. Department of Industrial Engineering and Management, School of Engineering, Jönköping University, Jönköping, Sweden.ORCID iD: 0000-0002-8305-4412
2018 (English)In: Industrial management & data systems, ISSN 0263-5577, E-ISSN 1758-5783, Vol. 118, no 7 (SI), p. 1413-1431Article in journal (Refereed) Published
Abstract [en]

Purpose

The purpose of this paper is to investigate models and methods for managing supply chain risks and delays in construction projects.

Design/methodology/approach

The study mainly employs quantitative analysis in order to identify disruptions in construction supply chains. It also uses paradigms of simulation modeling, which are suitable for risk assessment and management. Both qualitative and quantitative data were collected through a literature review and details of specific construction projects, respectively. A dynamic modeling method was used, and the model was provided with an event-based simulation. Simulation modeling was used to measure the performance of the system.

Findings

The study shows the benefits of applying the dynamic modeling method to a construction project. Using event-based simulation, it was found that construction delays influence both the magnitude and the probability of disruption. This method contributes to the existing theoretical foundations of risk management practices, since it also considers the time factor. This method supplements the Monte Carlo statistical simulation method, which has no time representation. Using empirical analysis, the study proposes increasing the safety stock of construction materials at the distribution center, so as to mitigate risks in the construction supply chain.

Research limitations/implications

The research considers a single case of a hypothetical construction project. The simulation models represent a simple supply chain with only one supplier. The calculations are based on the current economic scenario, which will of course change over time.

Practical implications

The outcomes of the study show that the introduction of a safety stock of construction materials at the distribution center can prevent supply chain disruption. Since the consideration of risks at all stages of construction supply chain is essential to investors, entrepreneurs and regulatory bodies, the adoption of new approaches for their management during strategic planning of the investment projects is essential.

Originality/value

This dynamic modeling method is used in combination with the Monte Carlo simulation, thus, providing an explicit cause-and-effect dependency over time, as well as a distributed value of outcomes.

Place, publisher, year, edition, pages
Emerald , 2018. Vol. 118, no 7 (SI), p. 1413-1431
Keywords [en]
Construction delays, Construction projects, Risk management, Simulation modelling
National Category
Economics and Business
Identifiers
URN: urn:nbn:se:hig:diva-27850DOI: 10.1108/IMDS-09-2017-0422ISI: 000446473700006Scopus ID: 2-s2.0-85052602697OAI: oai:DiVA.org:hig-27850DiVA, id: diva2:1245518
Available from: 2018-09-05 Created: 2018-09-05 Last updated: 2022-02-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Hilletofth, Per

Search in DiVA

By author/editor
Hilletofth, Per
By organisation
Industrial economicsCenter for Logistics and Innovative Production
In the same journal
Industrial management & data systems
Economics and Business

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 290 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf