hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering av automatlager och formatsåg: En fallstudie vid AB Edsbyverken
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering, Industrial Management.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering, Industrial Management.
2021 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

In today’s industry, efficient production is important for manufacturing companies to pursue. By improving efficiency, the companies can use less time and fewer resources to achieve the same performance, or even surpass the previous one. According to the concept of lean production, the performance efficiency can be increased by identifying waste within the business and counteract them. 

The purpose of this thesis was to study the flow of material between an automation storage system and an angular saw unit. In addition, suggestions for efficiency improvements were made on the interaction between the storage system and the angular saw unit. The focus was on waste, tied up capital, inventory, time reduction and production planning. The methods used were observations and interviews. The suggestions presented were: invest in an IT-system to gather data and allow inter-machine communication, define needed levels of material to storage to reduce capital tied up, standardize the concept of pre-stacking, use production planning, use a manual standard procedure when deviations occur, balance the flow between the storage system and the saw in pull fashion. The conclusion shows that the material flow between the storage system and the angular saw unit can be improved and become more efficient if the company implement our suggestions. 

Place, publisher, year, edition, pages
2021. , p. 38
Keywords [en]
Waste, Lean, Storage, Efficiency
Keywords [sv]
Slöseri, Lean, Lagerhållning, Effektivisering
National Category
Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:hig:diva-36870OAI: oai:DiVA.org:hig-36870DiVA, id: diva2:1583373
External cooperation
AB Edsbyverken
Supervisors
Examiners
Available from: 2021-08-17 Created: 2021-08-05 Last updated: 2021-08-17Bibliographically approved

Open Access in DiVA

fulltext(1394 kB)142 downloads
File information
File name FULLTEXT01.pdfFile size 1394 kBChecksum SHA-512
0abeeeff12b92650ab8cb3f1d82b9d56588d56179a25ed28d58d405af0dc2722f3a350ed56e823e2e4ae02a044958f1db5ebe8bb2927a55c11013e76f7c248fb
Type fulltextMimetype application/pdf

By organisation
Industrial Management
Other Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 142 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 321 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf