hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Hur kommunen påverkas vid avvägningen mellan motstridiga allmänna intressen: Fallstudie från Älvkarleby kommun
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Computer and Geospatial Sciences, Geospatial Sciences.
2022 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Bevarandet av natur och miljö är en viktig del av Sveriges markanvändningsplanering. Ett sätt att bevara dessa rika områden på lång sikt är genom inrättandet av naturreservat. Naturreservat upprättas oftast av Länsstyrelsen för just detta syfte vilket i vissa fall kan stå i kontrast till kommunens önskan om att använda marken för andra intressen och ändamål. Ett sådant exempel utgör Naturreservatet Häcksören som upprättades i december 2021 av Länsstyrelsen i Uppsala och inom vilket Älvkarleby kommuns avloppsreningsverk är beläget. Reningsverket och naturreservatet representerar båda allmänna intressen som i den avvägning som gjorts strider mot varandra.

Syftet med arbetet är att se hur utvecklingsambitionerna hos Älvkarleby kommun påverkas av den avvägning som är gjord mellan det allmänna intresset för reningsverket och det allmänna intresset för naturreservatet. Förhoppningen är att studien är till nytta för andra kommuner i fall där avvägningar görs mellan liknande motstridande allmänna intressen och där dess konsekvenser beaktas. 

Studien är baserad på kvalitativa metoder som har genomförts via en kombination av litteraturstudie, semi-strukturerade intervjuer och studier i lagrum och domar för att på bästa sätt besvara arbetets frågeställningar. Sju intervjuer har genomförts med sakkunniga personer inom ämnet som representerar de olika myndigheterna samt en utomstående juridiskt sakkunnig.

Resultatet av fallstudien visar att det finns olika syn mellan Älvkarleby kommun och Länsstyrelsen när det gäller den avvägningen som gjorts. Framför allt är detta förknippat med att de båda parterna ser fallet utifrån olika tidsperspektiv. Kommunen är angelägen om att ett eventuell nödvändigt framtida utökat ianspråktagande av mark för reningsverket säkerställs och således inte påverkar kommunens långsiktiga utvecklingsvisioner. Länsstyrelsens beslut grundar sig i situationen såsom den är idag. De förnekar inte att en utbyggnad av reningsverket kan bli aktuell men eftersom detta är oförutsägbart i tid och rum anses det inte relevant att ta detta i beaktande vid tillfället då reservatet inrättas. Studien avslutar med att diskutera huruvida kommunens argumentation ska tas i större beaktande vid liknande framtida fall.

Abstract [en]

Preserving nature and the environment is essential for Sweden's land use planning. One way to preserve these rich areas for the future is by setting up nature reserves. The County Administrative Board usually establishes nature reserves for this very objective, which in some cases may contrast with the municipality's desire to use the land for other interests and purposes. One such example is the Häcksören Nature Reserve, established in December 2021 by the County Administrative Board in Uppsala and within which Älvkarleby municipality's sewage treatment plant is located. The treatment plant and the nature reserve represent public interests that conflict with each other in the balance that has been struck.

The purpose of the study is to see how the development ambitions of Älvkarleby municipality are affected by the balance that has been made between the general interest in the treatment plant and the public interest in the nature reserve. The hope is that the study will be helpful for other municipalities in cases where balances are made between similar conflicting public interests and where its consequences are considered.

The study is based on qualitative methods carried out through a combination of literature study, semi-structured interviews, and studies in law and judgments to best answer the work's questions. Seven interviews were conducted with experts in the subject representing the various authorities and an outside legal expert.

The case study results show that there are different views between Älvkarleby municipality and the County Administrative Board regarding the balance that has been made. Above all, this is associated with the two parties seeing the case from different time perspectives. The municipality is concerned that any necessary future increased use of land for the treatment plant is ensured and thus does not affect the municipality's long-term development visions. The County Administrative Board's decision is based on the situation today. They do not deny that an expansion of the treatment plant may be relevant, but since this is unpredictable in time and space, it is not considered pertinent to take this into account when the reserve is established. The study concludes by discussing whether the municipality's argumentation should be taken into more significant consideration in similar future cases.

Place, publisher, year, edition, pages
2022. , p. vii+23
Keywords [en]
nature reserve, municipality, area protection, public interest, Älvkarleby municipality
Keywords [sv]
naturreservat, kommun, områdesskydd, allmänt intresse, Älvkarleby kommun
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:hig:diva-38838OAI: oai:DiVA.org:hig-38838DiVA, id: diva2:1667127
Subject / course
Lantmäteriteknik
Educational program
Surveying
Supervisors
Examiners
Available from: 2022-06-17 Created: 2022-06-09 Last updated: 2022-06-17Bibliographically approved

Open Access in DiVA

fulltext(491 kB)78 downloads
File information
File name FULLTEXT01.pdfFile size 491 kBChecksum SHA-512
267286cd40de645a11567a51829370be2f9089dd61bd1ce23b77438a2ccf3db6e7d1a426ccfa959d7b95f5f77e07817a00075ddc89ebfeb5b63f229bd9ca4dc0
Type fulltextMimetype application/pdf

By organisation
Geospatial Sciences
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 78 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 202 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf