hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering och flödeskartläggning: En jämförelse av arbetsflöden i ett industriserviceföretag
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering.
2023 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Introduction: To stay relevant, it is required that companies work with continuous improvements.Finding inefficiencies is not always easy. One way to try to find inefficiencies is throughflow mapping. This study examines what causes inefficient activities for industrial servicecompanies.

Purpose: The purpose of the study is to investigate how a workflow at an industrial servicecompany can be made more efficient with the help of flow mapping.

Method: The study is conducted through a case study at a service industry company that maintainsand repairs motors and frequency converters. Flow mapping was used to map activitiesin the workflow and literature was collected to be able to conduct a flow mappingcorrectly. Interviews and observations have been used to support the flow mapping.

Results: The company has two service workshops that have similar activities in their flow. Evenso, one of the workflows is more efficient than the other. Based on the comparison of theworkflows, inspiration has been used to adjust the workflow for the frequency converterworkshop. Using flow mapping and methods from lean, a future flow map has beencreated where non-value-added activities have been eliminated.

Conclusion: Based on the results, several improvement proposals have been drawn up for thecompany's workshops. Industrial service companies can use flow mapping and VSM toeliminate non-value-added activities. Lean tools can be used to create order and structurethat lead to shorter lead times. 

Place, publisher, year, edition, pages
2023. , p. 51
Keywords [sv]
Flödeskartläggning, value stream mapping, ledtid, lean, 5s, just in time
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hig:diva-42030OAI: oai:DiVA.org:hig-42030DiVA, id: diva2:1764516
Subject / course
Industrial engineering and management
Educational program
Industrial management and logistics – bachelor’s programme (swe or eng)
Supervisors
Examiners
Available from: 2023-06-15 Created: 2023-06-08 Last updated: 2023-06-15Bibliographically approved

Open Access in DiVA

fulltext(1000 kB)183 downloads
File information
File name FULLTEXT01.pdfFile size 1000 kBChecksum SHA-512
c012cf06226857d0c517722887c43679bc5239633f74ab260abb0b90d2ef6dc7d7e727a89d7668ef7d249bd07c5cc7f9081dd38b5d5467399e2a75748ae34c41
Type fulltextMimetype application/pdf

By organisation
Department of Industrial Management, Industrial Design and Mechanical Engineering
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 183 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 340 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf