hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Etablering av ett nytt stomnät i plan vid Högskolan i Gävle
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Computer and Geospatial Sciences, Geospatial Sciences.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Computer and Geospatial Sciences, Geospatial Sciences.
2023 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Högskolan i Gävle har en mängd av utbildningar som har anknytning till geodetisk mätning. Sedan tidigare finns det en uppsättning lägesbestämda punkter i Högskoleområdet som används inom dessa utbildningar där mätning förekommer. Punkterna har etablerats i olika omgångar, oberoende av varandra, och därför kan de inte kallas för ett stomnät. Syftet med detta examensarbete är att etablera ett stomnät i plan vid Högskolan i Gävle i referenssystemet SWEREF 99 16 30. Stomnätet bör hålla en hög kvalitet för att vara användbart inom all geodetisk mätning som Högskolan ägnar sig åt. Etableringen av stomnätet har delats upp i två delar. Den första delen består av planering, genomförande och efterberäkning av statiska GNSS-mätningar och den andra delen består av planering, genomförande och efterberäkning av terrestra mätningar (mätning med totalstation).

Etablering av stomnät utförs ofta i två steg där mätning med Global Navigation Satellite System (GNSS) används för att lägesbestämma ett antal utgångspunkter som ska omsluta resten av stomnätet. Statisk GNSS-mätning utfördes med Trimble R12i på 9 stabila markeringar runt Högskolan under tre mätsessioner. Baslinjeberäkning och nätutjämning utfördes i 4 olika scenarier för att se hur beräkningen av koordinater påverkades av olika val av frekvens och användning av fasta kontrollpunkter (SWEPOS referensstationer). 

För planering av terrester mätning och för att uppnå antalet rekommenderade sikter mellan punkter i stomnätet utfördes en rekognosering av Högskoleområdet, i kombination med simulering i datorprogrammet SBG Geo. Tillfälliga punkter markerades ut för att förbättra stomnätets geometri och uppnå kraven i HMK – Stommätning (2021) för stomnätets kontrollerbarhet. Stommätningen utfördes med satsmätning med totalstationen Trimble S5 1’. I efterberäkningen undersöktes vilken anslutningsmetod som var mest lämplig med avseende på skattade standardosäkerheter för utgångspunkter och nypunkter.

Resultatet blev ett stomnät med totalt 36 markerade punkter. Viktsenhetens standardosäkerhet för stomnätet blev 0,2055 och kontrollerbarheten 0,6 efter en unitär transformation, och en skattad standardosäkerhet för nypunkter på millimeternivå. Kvadratisk medelavvikelse mellan utgångspunkter inmätta med GNSS-teknik och nypunkter inmätta med terrester teknik blev 4,39 mm.

Abstract [en]

The University of Gävle has a range of courses related to geodetic surveying. There is already a set of points with coordinates in the university area, which are used in courses where geodetic surveying occurs. The points have been established at different times, independently of each other, and therefore cannot be called a geodetic control network. The purpose of this thesis is to establish a control network in 2D at the University of Gävle, in the reference system SWEREF 99 16 30. The control network should be of high quality to be useful in all geodetic surveying that the university engages in. The establishment of the control network has been divided into two parts, the first part consists of planning, implementation and post-processing of static GNSS measurements, and the second part consists of planning, implementation and post-processing of terrestrial measurements.

The establishment of a geodetic control network is often carried out in two steps where measurement with Global Navigation Satellite System (GNSS) is used to determine the position of a number of starting points that will surround the rest of the control network. Static GNSS measurements was performed with Trimble R12i on 9 stable markings around the university during three sessions. Baseline calculation and network adjustment were performed in 4 different scenarios to see how the calculation of coordinates was affected by different choices of frequency and use of fixed control points (SWEPOS reference stations).

For planning of the terrestrial measurements, and to achieve the recommended number of sights between points in the control network, a simulation in the computer program SBG Geo. Temporary points were marked out to improve the geometry of the control network and meet the requirements in HMK – Stommätning (2021) for the controllability of the control network. The terrestrial measurements were carried out by surveying with total station Trimble S5 1’. In post-processing, the alternatives for connecting the control network to SWEREF 99 16 30 was investigated with regard to estimated standard uncertainties for starting points and new points. The result is a geodetic control network with a total of 36 marked points. The standard error of unit weight for the control network resulted in 0.21 after a unitary transformation, and the estimated standard uncertainty for new points was at the millimeter level. The average deviation between starting points measured with static GNSS and new points measured with terrestrial technology was about 4 mm.

Place, publisher, year, edition, pages
2023. , p. ix+42+bilagor
Keywords [en]
Geodetic control network, static GNSS, total station
Keywords [sv]
Stomnät, statisk GNSS, totalstation
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:hig:diva-42728OAI: oai:DiVA.org:hig-42728DiVA, id: diva2:1781180
Subject / course
Lantmäteriteknik
Educational program
Surveying
Supervisors
Examiners
Available from: 2023-07-07 Created: 2023-07-07 Last updated: 2023-07-07Bibliographically approved

Open Access in DiVA

fulltext(7983 kB)311 downloads
File information
File name FULLTEXT02.pdfFile size 7983 kBChecksum SHA-512
5a86c97bf46be17ae8153e5ac60d8fe9050782ed41f891f0e77c10f6378e5daca244c2ec7299398f8283c32c40099d04d75dd5bc9b2cb3d70b16bcf29d64000b
Type fulltextMimetype application/pdf

By organisation
Geospatial Sciences
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 311 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 580 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf