hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Etablering av ett nytt stomnät i plan och höjd i SWEREF 99 16 30 och RH 2000 i Hus 45 vid Högskolan i Gävle
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Computer and Geospatial Sciences, Geospatial Sciences.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Computer and Geospatial Sciences, Geospatial Sciences.
2024 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Sustainable development
Sustainable development according to the University's criteria is not relevant for the essay/thesis
Abstract [sv]

Stommätning innebär att etablera, komplettera och/eller renovera stompunkter i ett stomnät. Syftet med examensarbetet är att etablera ett stomnät i plan i referenssystemet SWEREF 99 16 30 och i höjd i RH 2000 inomhus i Hus 45, Heimdall, vid Högskolan i Gävle. Det undersöks särskilt vilken relativ lägesosäkerhet som är möjlig att uppnå med avseende på de praktiska begränsningar som finns i Hus 45 med begränsad sikt mellan punkterna. Önskemålet gällande nätets relativa standardosäkerheter är 2–3 mm i plan och 1–2 mm i höjd och för att uppnå det undersöks hur nätet i plan och höjd bör planeras, markeras, mätas och beräknas.  

Metoden för projektet följer i stora drag rekommendationerna i HMK när det gäller stommätning, beräkning och utvärdering. Först har nätets preliminära utformning rekognoserats, vilket sedan har legat till grund för simuleringar. Dessa gjordes för att få en uppfattning om vilken kvalitet en viss nätutformning skulle ge och på så sätt kunde en så bra geometri som möjligt väljas. Tre olika planeringsförslag togs fram i både plan och höjd. Mätningarna har utförts med en totalstation, Trimble S51” och ett digitalt avvägningsinstrument, Trimble DiNi. Genom helsatsmätning och dubbelmätta längder med 45 fria stationsuppställningar i plan, och finavvägning med hjälp av 28 dubbelavvägda fixhåll som kompletterats med trigonometrisk höjdmätning, har punkterna i plan och höjd mätts in. Beräkning av koordinater och kvalitetsparametrar för nypunkterna har utförts i en nätutjämning i plan och en i höjd i programvaran SBG Geo. 

I plan exkluderades 34 observationer (data-snooping) från en fri utjämning, som slutligen passades in mot de kända punkterna med en plan Helmerttransformation. Kvalitetsparametrarna för nätet i plan inkluderar utvärdering av viktenhetens standardosäkerhet (0,64), kontroll av det genomsnittliga k-talet (0,58) samt kontroll enligt HMK:s 3-nivåprincip (2 observationer utanför kassationsgränsen). I höjd togs 9 observationer bort med data-snooping från en fri utjämning, som sedan passades in med en translation i höjd. Kvalitetsparametrarna för nätet i höjd inkluderar utvärdering av viktenhetens standardosäkerhet (0,76), kontroll av det genomsnittliga k-talet (0,62) samt kontroll enligt HMK:s 3-nivåprincip (5 observationer utanför kassationsgränsen). De skattade standardosäkerheterna för de beräknade nypunkterna är inom målet som sattes upp för projektet. Den maximala standardosäkerheten blev 1,7 mm i plan och 0,8 mm i höjd.

Abstract [en]

Control point surveying involves establishing, supplementing, and/or renovating control points in a control network. The purpose of the thesis is to establish a control network in the horizontal in the SWEREF 99 16 30 reference system and in height in the RH 2000 height system. The network is situated indoors in Building 45, Heimdall, at the University of Gävle. The thesis specifically examines the achievable relative standard uncertainty considering the practical limitations in Building 45 with limited visibility between points. The required relative standard uncertainties for the network are 2-3 mm in the horizontal and 1-2 mm in the height component. To achieve this goal, different ways to plan, mark, measure, and calculate the network are studied.

The project methodology broadly follows the recommendations in the Swedish HMK handbook for control point surveying, calculation, and evaluation. First, reconnaissance was made of the preliminary network design, which then formed the basis for simulations. These were made to assess the quality of a particular network design, allowing for the selection of the best possible geometry. Three different planning proposals were developed both in the horizontal and in the vertical. Measurements were carried out using a total station, Trimble S51”, and a digital levelling instrument, Trimble DiNi. By conducting full set measurements and double-measured distances from 45 free stations, and double run levelling of 28 height differences complemented by trigonometric heighting, the horizontal and vertical coordinates of the points were determined. The adjustment and estimation of quality parameters were performed using the network adjustment module in SBG Geo.

34 observations were excluded by data-snooping from an unconstrained adjustment, which was subsequently fitted to the known stations using a Helmert transformation. Quality parameters for the network in the horizontal include evaluation of the standard uncertainty of unit weight (0.64), the average redundancy number (0.58), and check of the standardised residuals according to the HMK 3-level principle (2 observations outside the rejection limit). 9 observations were excluded (data-snooping) from an unconstrained adjustment, which was then fitted by a 1-parameter translation in the height. Quality parameters for the network in height include evaluation of the standard uncertainty of unit weight (0.76), average redundancy number (0.62), and check of the standardised residuals according to the HMK 3-level principle (5 observations outside the rejection limit). The estimated standard uncertainties for the calculated new points are within the project's set goal. The maximum standard uncertainty in the plane was calculated to be 1.7 mm and 0.8 mm in height for a single point.

Place, publisher, year, edition, pages
2024. , p. viii + 40 + bilagor
Keywords [en]
Control network, network adjustment, totalstation, RH 2000, SWEREF 99
Keywords [sv]
Stomnät, nätutjämning, totalstation, RH 2000, SWEREF 99
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:hig:diva-45257OAI: oai:DiVA.org:hig-45257DiVA, id: diva2:1885028
Subject / course
Lantmäteriteknik
Educational program
Surveying
Supervisors
Examiners
Available from: 2024-08-05 Created: 2024-07-19 Last updated: 2024-08-05Bibliographically approved

Open Access in DiVA

fulltext(1808 kB)122 downloads
File information
File name FULLTEXT01.pdfFile size 1808 kBChecksum SHA-512
c317c9c33ca35dff28445b9635a049ecefe5f9c97e07ea0082b4334dbdf3c488f708d4d61c0644e96a908b236735cf63eadce244596f758fa46ef7e37c2ceede
Type fulltextMimetype application/pdf

By organisation
Geospatial Sciences
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 122 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 134 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf