hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Håltagning i betongbjälklag
University of Gävle, Department of Technology and Built Environment, Ämnesavdelningen för byggnadskvalitet.
University of Gävle, Department of Technology and Built Environment, Ämnesavdelningen för byggnadskvalitet.
2009 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

På grund av maskinernas behov av att transportera bort restprodukter samt att nödvändiga vätskor ska kunna tillföras, har hål borrats ut ur betongbjälklaget i verkstad 77 vid Sandvik Toolings anläggning i Gimo under flera år. Detta utan att några större åtgärder har genomförts för att återställa bjälklaget till sin ursprungliga hållfasthet.

Examensarbetets syfte är att kontrollera möjligheterna att göra hål i betongbjälklaget. Detta görs teoretiskt. Det som även skall besvaras är om det finns någon metod som kan återge betongbjälklaget en del av sin hållfasthet.

Från Sandviks arkiv i Sandviken erhölls de ritningar som var aktuella. Dessa ritningar gav svar på byggnadens konstruktion. Från dessa bestämdes de områden som skulle undersökas.

Vid område 1 kunde det kapas stänger vid varje fält och stöd:

Vid upplag 1 kan 18 stänger kapas, upplag 2 kan 2 stänger kapas, upplag 3 kan 14 stänger kapas och vid upplag 4 kan 12 stänger kapas.

Vid fält 1 kan 11 stänger kapas, fält 2 kan 17 stänger kapas, fält 3 kan 15 stänger kapas och vid fält 4 kan 12 stänger kapas

Vid område 2 kan det kapas stänger i båda riktningarna över pelaren som studeras, totalt 12 i x-led och y-led tillsammans.

Detta resultat baseras på de antaganden som har gjorts vid de olika områdena. Det vill säga att de stänger som kan kapas i område 1 är de som kan kapas i den fem meter breda strimla som studeras, i område 2 är antalet stänger som kan kapas baserade på enbart den pelare som studeras.

Abstract [en]

The waste that is created by the machines due to the process needs to be transported away and necessary liquids must be transported to the machines. This requires that holes are drilled through the concrete slab in building 77 at Sandvik Toolings facilities in Gimo, this has been done for several years. For some holes insufficient attempts to restore the concrete slabs strength has been done.

The purpose of this degree thesis is to investigate the possibility to make holes in the concrete slab. This will be done theoretical. Another question that shall be answered is if there are any methods for the concrete slab to regain strength.

The blueprints that were needed where obtained from Sandviks archive in Sandviken. From the blueprints the areas which were to be investigated was selected.

In area 1 reinforcement bars could be cut of in both field and support areas:

At support 1, 18 reinforcement bars could be cut of. At support 2, 2 reinforcement bars could be cut of. At support 3, 14 reinforcement bars could be cut of and at support 4, 12 reinforcement bars could be cut of.

In field 1, 11 reinforcement bars could be cut of. At field 2, 17 reinforcement bars could be cut of. At field 3, 15 reinforcement bars could be cut of and at support 4, 12 reinforcement bars could be cut of.

In area 2, reinforcement bars could be cut of in both directions that were studied, in total 12 bars in x-direction and y-direction combined.

These results are based on the assumptions that have been made in each area. Videlicet that the number of bars that can be cut of in area 1 are the number of bars that can be cut of in five meters shred that is studied. In area 2 the number of bars that can be cut of is based only on the pillar that is studied.

Place, publisher, year, edition, pages
2009. , p. 40
Keyword [sv]
Håltagning, betong, betongbjälklag
Identifiers
URN: urn:nbn:se:hig:diva-4711Archive number: TEX 090401OAI: oai:DiVA.org:hig-4711DiVA, id: diva2:223883
Presentation
(Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2009-08-04 Created: 2009-06-12 Last updated: 2009-08-04Bibliographically approved

Open Access in DiVA

fulltext(1927 kB)1288 downloads
File information
File name FULLTEXT01.pdfFile size 1927 kBChecksum SHA-512
e5093cf0dde31a20893cf0cadc7d821026e778391d48f801de87783905304fa39ea665a0f5fc466d4944f51e430c22e3b67ce0cebe4da059d21b61439b877bf3
Type fulltextMimetype application/pdf

By organisation
Ämnesavdelningen för byggnadskvalitet

Search outside of DiVA

GoogleGoogle Scholar
Total: 1288 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 291 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf