hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
DESIGN, COSTING AND FEASIBILITYOF BUKABA MICRO-HYDRO POWERPLANT: A RWANDA RURALELECTRIFICATION CASE STUDY
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Building, Energy and Environmental Engineering. KTH.
2013 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Rwanda is one of the world's developing countries located in southern sub-Saharan region in Africa; and one of its most pressing environmental concerns is its need for stable and community-managed electrical power.

Micro-Hydro Power (MHP) projects have proved to be an economical and efficient alternative in the effort to power remote villages deep in the rural area.This study investigates the efficacy of community- based MHP projects in one of these villages, in Rongi sector as well as the role of public participation in these projects.

The main aim of this thesis was to develop a case study for the development of BUKABA MHP as the model at the specified zone where there is a lot of small rivers and this research shall provide a real life study at the inhabiting and the enabling factors for the development of micro scale hydro in rural areas of Rwanda.

This studyb employs a case study methodology, for the design, costing and determine financial viability and feasibility of the BUKABA MHP as one piloted with data collection taken on site surveys, and document reviews using RETScreen.

This study use RETScreen, as the result, the maximum power output calculated was 97kW which will be used by primary and secondary schools, local administrative buildings, commercial centers, and about 100 households at the estimated total initial cost of $CAD 619,000 as it was shown by RETScreen hydro formula costing method sheet. 

We recommend the Gouvernment of Rwanda to use this project as model to be implemented, even to use it in any other area where there is availability of water. But, before implementation, the bill of quantities will be prepared to enable the Gouvernment obtain the details about the final and initial cost of the concerned project.

Place, publisher, year, edition, pages
2013. , p. 56
Keywords [en]
BUKABA MHP Pant
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hig:diva-15839OAI: oai:DiVA.org:hig-15839DiVA, id: diva2:676837
External cooperation
IPRC-Kigali
Subject / course
Energy systems
Presentation
2013-12-04, Master Lab- KIST_RWANDA, KIGALI_RWANDA, KIGALI, 14:40 (English)
Supervisors
Examiners
Available from: 2014-03-04 Created: 2013-12-06 Last updated: 2014-03-04Bibliographically approved

Open Access in DiVA

NIYONSABA Maximilien Final Thesis(2180 kB)7166 downloads
File information
File name FULLTEXT03.pdfFile size 2180 kBChecksum SHA-512
4cca22304645a849354888dc9e06154f6c7284faea30a491ab58223465571f3be1347a4d2874ae60135ca7d1f94e8b958dcef1782395c002eb62c0ec6a750466
Type fulltextMimetype application/pdf

By organisation
Department of Building, Energy and Environmental Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 7204 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 781 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf