hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Try to see it my way: Towards a multi-actor perspective in the project owner-manager relationship
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Development, IT and Land Management.
2015 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Project management involves many different actors. Rather than solely looking at those actors as individuals, the interaction between them should not be forgotten either. This thesis tries to provide a better understanding of one specific type of interaction: the project owner-manager relationship. This relationship is approached as the dyadic interaction between one project manager and one project owner. Previous studies indicate that project owners and project managers depend on one another, but that they can have diverging perspectives as well. The goal of this study is to get a deeper understanding of how these different perspectives can influence the success of the project-owner relationship. In order to achieve this understanding, a multiple case study involving 8 project owner-manager relationships was employed. Both project owners and project managers were interviewed, in order to get closer to a multi-actor perspective. The results show that there are both similarities and differences between the perspectives of these actors. However, a lack of understanding between these perspectives can cause the project owner-manager relationship fail. In the end, the potential effects of this relationship cannot and should not be ignored, as this study shows that it can be the difference between project success and project failure. Therefore, in a world that is ever more dominated by projects, this thesis has multiple practical and scientific implications. 

Place, publisher, year, edition, pages
2015. , p. 65
Keywords [en]
Project owner, Project management, Project interaction, Project stakeholders, Project owner-manager relationship, Principal agency theory
National Category
Engineering and Technology Economics and Business
Identifiers
URN: urn:nbn:se:hig:diva-19731OAI: oai:DiVA.org:hig-19731DiVA, id: diva2:822799
Subject / course
Industrial engineering and management
Educational program
Management of logistics and innovation – master’s programme (one year) (swe or eng)
Supervisors
Examiners
Available from: 2015-06-17 Created: 2015-06-17 Last updated: 2015-06-17Bibliographically approved

Open Access in DiVA

fulltext(1384 kB)288 downloads
File information
File name FULLTEXT01.pdfFile size 1384 kBChecksum SHA-512
7591f253474121fd26ad1faf0ee60b5cb185b9ffa73c7e48c8c84340b7013c2121afc0fca09964f66acf1ba7bd93280a0fe27049355e8cf753ac60e13fb12ee2
Type fulltextMimetype application/pdf

By organisation
Department of Industrial Development, IT and Land Management
Engineering and TechnologyEconomics and Business

Search outside of DiVA

GoogleGoogle Scholar
Total: 288 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 572 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf