Produktionsanpassad BIM för arbetsberedning, visualisering och mängdning inom betong och markarbeten
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Building, Energy and Environmental Engineering.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Building, Energy and Environmental Engineering.
2016 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Sustainable development
The essay/thesis is partially on sustainable development according to the University's criteria
Abstract [sv]

I den här studien har författarna undersökt hur byggföretaget Skanska använder Building Informationen Modelling (BIM) idag på Nya Karolinska i Solna (NKS) och dess möjligheter utöver hur det används idag. Syftet med studien var att undersöka om man med hjälp av BIM kan skapa bättre förutsättningar för arbetsberedning, visualisering och mängdning på NKS. Målet med undersökningen var att kunna ge rekommendationer till Skanska hur de med hjälp av BIM kan förbättra förutsättningarna för arbetsberedning, visualisering och mängdning för betong och markarbeten.

För att uppnå målet har författarna genomfört en litteraturstudie där vetenskapliga artiklar analyserats. Författarna har efter analysen genomfört en fallstudie i form av intervjuer med ett urval av yrkesgrupper från Skanska. Intervjuerna genomfördes för att undersöka hur Skanska använder BIM idag. Fallstudien jämfördes sedan med litteraturstudien för att undersöka kopplingen mellan teori och hur det är på NKS.

Studien visade på att BIM har stort potential att underlätta arbetet med arbetsberedning, visualisering och mängdning för betong och markarbeten inom produktionen på NKS. Genom att man använder sig av BIM och dess 3D-modeller för visualiseringen av projektet så skapar man bättre förståelse för projektet. Med 3D-modellen ges även möjligheten att hämta mängder direkt ur modellen med hjälp av volymen för det valda elementet. Lägger man även till 4D BIM (tidsplanering) så kan man skapa en tidseffektiv planering. Det man dock skulle behöva göra på NKS är att informera personalen om vad BIM är och fördelarna som finns med att använda sig av BIM.

Abstract [en]

In this study, the authors investigated how the building construction company Skanska uses Building Information Modelling (BIM) today at the New Karolinska in Solna (NKS) and its capability. The study was limited to work preparation, visualization and quantification of concrete and ground works in the construction site. The purpose of this study was to investigate whether or not using BIM can create better conditions for job preparation, visualization and quantification at NKS. The goal of the survey was to provide recommendations to Skanska about how using BIM can improve conditions for work preparation, visualization and quantification of concrete and ground works. To achieve this goal, the authors conducted a review and analysis of scientific articles. The authors have carried out and analyzed a case study by interviewing a sample of professions from Skanska. The interviews were conducted to examine how Skanska are using BIM today. The case study was then compared with the literature study to investigate the link between theory and how it works at NKS.

The study found that BIM has great potential to favor the process of work preparation, visualization and quantification of concrete and ground works in the construction site of NKS. By the use of BIM and its 3D models for visualization will create better understanding for the project. The 3D model gives the opportunity to get material quantities directly from the model by using the volume of the selected element. 4D BIM (scheduling) gives opportunies to create a time-efficient planning. That would be needed to do at NKS is to inform the staff of what BIM is and the benefits by using BIM.

Place, publisher, year, edition, pages
2016. , 36 p.
Keyword [sv]
BIM inom produktionen, BIM, arbetsberedning, mängdning, visualisering
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hig:diva-21759OAI: oai:DiVA.org:hig-21759DiVA: diva2:939544
External cooperation
Skanska
Subject / course
Building engineering
Educational program
Högskoleingenjör
Presentation
2016-06-07, 10:00 (Swedish)
Supervisors
Examiners
Available from: 2016-06-27 Created: 2016-06-20 Last updated: 2017-01-02Bibliographically approved

Open Access in DiVA

fulltext(846 kB)103 downloads
File information
File name FULLTEXT01.pdfFile size 846 kBChecksum SHA-512
8593d9ec3f72114c8396d1779bb4816e996e8269fbda03a26912d68f8f6638f0cb97080167ddb1e945d34c40b8ca50b197b4a974ba2f6495c6f631909af5b829
Type fulltextMimetype application/pdf

By organisation
Department of Building, Energy and Environmental Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 103 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 335 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf