hig.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Undersökning av skillnader mellan planerad och verklig produktionstid: – En fallstudie hos AQ Group i Pålsboda
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering.
University of Gävle, Faculty of Engineering and Sustainable Development, Department of Industrial Management, Industrial Design and Mechanical Engineering.
2020 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

På senaste tiden har leveransprecision blivit allt viktigare eftersom kunder idag kännetecknas av att vara mer tidskänsliga och ständigt söker efter produkter som är specifikt anpassade till kunden. Tid har därmed betraktats som ett kriterium för konkurrens och är betydande för företag att kunna konkurrera på marknaden. Osäkerheter i marknaden har en stor påverkan på leveransprecision och det är en stor utmaning för företag att planera produktion utifrån dessa osäkerheter. När produktion för en artikel planeras måste en planerare ta hänsyn till osäkerheter som exempelvis att en maskin kan sluta fungera, att en defekt produkt måste omarbetas eller att det tar längre tid än planerat för att utföra ett arbetsmoment som leder till att en ledtid blir längre.

Syftet med studien var att identifiera orsaker till skillnaden mellan planerad och verklig produktionstid samt ge förbättringsförslag för att minska skillnaden. Syftet har uppfyllts med hjälp utav en fallstudie på AQ Group i Pålsboda och genom intervjuer där planerad och verklig produktionstid har undersökts. En litteraturstudie har utnyttjats och tre frågeställningar har formulerats till studien. Dessa frågeställningar lyder: Hur ser skillnaden ut mellan planerad och verklig produktionstid? Vad är orsakerna till dessa skillnader? Hur kan dessa orsaker elimineras? Under det teoretiska avsnittet har fokuset varit på cykeltider, ställtider, produktionstid, Lean och produktionsplanering.

Resultatet visar en total skillnad på 24 % mellan den planerade och verkliga produktionstiden över en 5-dagarsperiod. Några orsaker som påträffats är att de standardiserade arbetssätten inte är uppdaterade, inte är tvingande för operatörer att utföra och att det inte existerar några illustrationer för standardiseringen. En annan orsak är onödiga arbetsmoment där verktyg ligger långt ifrån arbetsstationerna och ibland fattas som gör att produktionstiden blir längre än planerat. Avslutningsvis presenteras kritiska förbättringsförslag som specifikt påverkar skillnaden i produktionstiderna och allmänna förbättringsförslag som AQ Group i Pålsboda kan ta nytta av för att effektivisera verksamheten.

Abstract [en]

In recent times delivery precision has become more important to customers, which today are characterized by being more time sensitive and constantly looking for products that are specifically tailored to the customer. Time is being seen as a criterion for competitors and it is important for companies to be able to compete in the market. Uncertainties in the current market have an effect on delivery precision and it is a major challenge for companies to plan production based on these uncertainties. When production for an article is planned, it should be planned in consideration of uncertainties, for example, a machine may break down, a defective product may need a rework or that it takes longer than planned to carry out an operation leading to a longer lead time.

The purpose of the study was to identify causes of difference between planned and actual production time and to provide improvement suggestions to reduce the difference. The purpose has been achieved through a case study in AQ Group in Pålsboda with help of interviews where planned and actual production time has been investigated. A literature study has been used as well as three questions. These questions are: What is the difference between planned and actual production time? What are the causes of these differences? How can these causes be eliminated? During the theoretical section, the focus has been on cycle times, setup times, production time, Lean and production planning.

The results show a total difference of 24% between the planned and actual production time over a 5-day period. Causes that have been found are that the standardized working methods are not up to date, are not mandatory for operators to perform and that there exist no illustrations for the standardization. Another cause is unnecessary work steps where tools is far away from the workstations and sometimes missing which leads to the production time being longer than planned. Lastly the study provides critical improvement suggestions that specifically affect the differences between planned and actual production times and general improvement suggestions that AQ Group in Pålsboda can take part of to streamline operations.

Place, publisher, year, edition, pages
2020. , p. 43
Keywords [en]
Lean, 5S, cycle time, cycle time variance, production planning, production time variability, production time estimation, production planning, setup time
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hig:diva-32969OAI: oai:DiVA.org:hig-32969DiVA, id: diva2:1446801
Subject / course
Industrial engineering and management
Educational program
Industrial management and logistics – bachelor’s programme (swe or eng)
Presentation
2020-06-17, Online, Stockholm, 12:30 (Swedish)
Supervisors
Examiners
Available from: 2020-06-25 Created: 2020-06-24 Last updated: 2025-10-02Bibliographically approved

Open Access in DiVA

fulltext(544 kB)1095 downloads
File information
File name FULLTEXT01.pdfFile size 544 kBChecksum SHA-512
3165f639824d8aa92b161dd0ce79e9640b1681ebbae86bc905c6330bfbf806b62d89dfdaab5bc43a7e8eac2bcf96917fe460308aecab95b00dda4e11c2a6c18c
Type fulltextMimetype application/pdf

By organisation
Department of Industrial Management, Industrial Design and Mechanical Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 1097 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 836 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard-cite-them-right
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • sv-SE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • de-DE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf